CAMAC Progress Report Week Ending: May 24, 2002 Week: 69 Tom Folkers: Tom Sargent: Pete Hubbard: 1. SMT for Digital Back End chassis testing. Stopped the noise that caused extra counts from counter #3. By adding a 750 Ohm resistor is series with the signal line that drives the counters it cuts the ringing and crosstalk enough to operate properly. 2. Looked for drawings of the tilt meter. I only found calibration data. 3. Started making changes to the Mux chassis by add resistors to the signal lines. 4. Continuing with PC board design. David Forbes: