CAMAC Progress Report Week Ending: April 26, 2002 Week: 65 Tom Folkers: 1. Testing at HHT this week. 2. I spend most of week sick. Not much use to anybody. Tom Sargent: 1. The new stop-in-path feature appears to be successful. When the telescope is following a sun avoidance path to slew to an object, you can now change your mind by clicking on another object (or a on several new objects in succession). The telescope comes to a stop while remaining on the sun avoidance path, calculates a new path to the most recently selected object and moves to it. 2. Beam switching (which didn't work on the last engineering run) works well now. Plots of azimuth vs. time look pretty good. An 740 arcsec shift in Azimuth was done in times ranging from 2.8 sec. to 3.4 sec. 3. Discovered and fixed a bug in the sun avoidance path computation and in the code that monitors the difference between the commanded and the observed velocities (stops the telescope if the difference gets too large). 4. Bill Peters and I compared the pointing accuracy of the old system and the new system using the same pointing model. After developing new fiducial cycle count values that make the 2 systems agree better, and checking precession (agreement is very good). we are left with a difference in azimuth that runs from about 2 arcsec at low elevation and about 12 or 14 arcsec at high elevation. There's a smaller variation in elevation which runs from 0 to 4 arcsec. Since the old system is known to be accurate to a small fraction of an arcsec, we must still have some inaccuracy or omission in the new code. We collected some position vs. time data (which still needs to be analyzed) which will allow us to verify the 2 systems' LST values. A small systematic difference in apparent LST would explain much of the problem. 5. Worked more on the hide-from-sun code, but didn't get it far enough to test it. Pete Hubbard: 1. SMT encoder testing with the lab amplifier chassis. First looking at the signal coming from elevation motor encoder. The 60Hz was 102dB below the signal. I moved to elevation 1 encoder and the 60Hz was only 78dB below the signal. The majority of the noise is between the SMT encoder and the amplifier box on the wall. Further test and looking at cable routing to find were the noise is being injected into the cable. 2. DBE mux chassis testing with the VCO signals looks good at the differential receiver Am26LS32. The mux chip output had some ground bounce but not enough to cause false triggering of the counters. Lori Warner: 1. I was out sick three days this week. 2. Continued learning GTK and GDK using your main.c example.I can make several widgits, but now need to pack them in a box to display on one screen. Getting into Drawing now.... slowly. Dave Ashby: 1. No Report.