CAMAC Progress Report Week Ending: September 21, 2001 Week: 34 Tom Folkers: 1. More work on meters program. Began investigating the various bits that make up system status. Such as building doors and hatches. 2. Began preparations for our test session next week at the site. 3. Spent two days getting 12 Meter apex control computer working. Tom Sargent: 1. The new state driven logic has been tested. 2. Added code to "pause" the telescope under some conditions such as too great a disparity between commanded velocity and observed velocity. 3. Wrote more documentation. 4. Updated 12 Meter Apex control drivers from kernel version 1.22.?? to 2.2.14. Pete Hubbard: 1. Making connectors for SMT new electronics. 2. Packing cables and drawings for the trip to SMT. 3. Vacation time. Dave Ashby: 1. No Report.