CAMAC Progress Report Week Ending: December 21, 2001 Week: 47 Tom Folkers: 1. No Report. Tom Sargent: 1. Added new fixed positions to the rambo/azel file. To simplify measuring servo response. 2. Altered IRIG driver so that when it detects a sync error from the IRIG interface, it reports it, but also continues to report the time that the IRIG interface is showing. It previously was not reporting the time in that case. It seems that the time is correct even during the brief periods when the interface has lost sync. It uses an internal oscillator in this case. The interface only has this problem in the lab. The IRIG signal at the HHT is better. The servo program will now stop if the IRIG sync is lost for more than 1 hour. 3. Implemented the pointing corrections from the 12m into the traksub.c program. It hasn't been check yet, except to see that the numbers are in the general range that would be expected. Pete Hubbard: 1. Made wiring changes to Digital Back End chassis. 2. Plot phase and amplitude changes with MAX270 low pass filter. 3. Took data from the lab telescope to compare noise with SMT data. 4. Changed MPI 6000 amplifier boards for next run at SMT. Dave Ashby: 1. No Report.