Job/Description |
Who ? |
Pri |
Done |
| |
|
|
|
Building
|
|
|
|
|
Rebuild the gas powered hydraulic pump/engine. |
SB |
1 |
|
|
Hydraulic service |
SB |
1 |
|
|
Clean track. |
All |
1 |
|
|
Adjust building wheels |
SB |
1 |
|
|
Crane maintenance |
SB |
1 |
|
|
Investigate stink detector to find sewer smell source. |
SB/TF |
1 |
|
|
Get manufacturer to adjust Building Drives and to train staff
to do this. |
TF |
1 |
|
|
Door and roof limit switches |
SB |
1 |
|
|
Check lights and interlocks on door controller |
BM |
1 |
|
|
Investigate building drive fuse issue. |
TF BF |
1 |
|
|
Install Evaporation Cooler for computer room HVAC system |
TF SB |
1 |
|
|
Install wind station on SMT Roof |
SB MM |
1 |
|
|
Order, build, check and
replace optic cables on 4th Floor walls |
TJ BM |
1 |
|
|
Check for light leaks |
TJ |
1 |
|
|
Review w/operators how
to turn on and run the gas engine to open / close doors |
SB All |
1 |
|
|
Building drive tests |
BF |
2 |
|
|
Maintenance on building hatches |
PF |
2 |
|
|
Inspect and repair hatches. |
BM. |
2 |
|
|
Engrave & inventory SMT
equipment. |
BM |
2 |
|
|
Go through all cables
throw out bad ones and replace with correct ones. |
BM |
2 |
|
|
Run gasoline engine, open and close doors. |
SB |
2 |
|
|
Install fans for 5th
Floor walls |
SB All |
2 |
|
|
Install soap dish in
room 3 bathroom |
SB |
2 |
|
|
Clean off & seal
concrete for loading zone and ramp |
PF |
3 |
|
|
Check all bathroom
showerheads for mineral clogs |
PF |
3 |
|
|
Paint fourth floor |
SB |
3 |
|
| |
|
|
|
Telescope
|
|
|
|
|
Inspect and grease hot-vane slider. |
SB |
1 |
|
|
Calibrate building vs. antenna limit switches.. |
SB |
1 |
|
|
Check elevation wrap |
SB |
1 |
|
|
Grease elevation motors and bearings. |
SB |
1 |
|
|
Check out inclinometers. |
BP |
2 |
|
|
Put inclinometer temperature probe in FMS. |
TF |
2 |
|
|
Investigate SAFELY washing dust etc off dish and tertiary |
SB |
2 |
|
|
Check out Krupp Servo Control Unit documentation. |
RF |
2 |
|
| |
|
|
|
Pier
|
|
|
|
|
Clean and grease Az and El bearings |
SB |
1 |
|
|
Clean & grease ring gear |
SB |
1 |
|
|
Grease elevation motors |
SB |
1 |
|
|
Check for gas leaks |
SB |
1 |
|
|
Clean upper landing. |
SB |
1 |
|
|
Check Az wrap for cable wear. |
SB |
2 |
|
| |
|
|
|
Computers / Control System
|
|
|
|
|
Finish integrating Unipops. |
CC |
1 |
|
|
Back up all observers data / user areas first |
TF |
1 |
|
|
Upgrade all Non-Real-time Linux boxes to Fedora Core 5.0 |
TF |
1 |
|
|
Install and program zero check box on VCO's |
TF |
1 |
|
|
Implement "Ostrich Mode" for CloudSat flyovers |
BP BF |
1 |
|
|
Implement system wide shutdown procedure |
TF |
1 |
|
|
Replace & clean ALL fans |
PF |
1 |
|
|
Check out why Inclinometer #3 signal intermittently off by 2x |
BP DF |
1 |
|
|
Include a goodness-of-fit indication in the pointing data |
TF |
1 |
|
|
Limit pointing fit extrapolation by Dataserv to < 2x grid
spacing |
TF |
1 |
|
|
Implement a velocity offset for planet & comet observing |
BP |
1 |
|
|
Get rid of spurious "SYNA differs" warnings |
BP |
1 |
|
|
Keep antenna drive out of Pause when operator selects object
in SAZ |
BP |
1 |
|
|
Debug tracking at elevations > 85 degrees |
BP TS |
1 |
|
|
Automatically insert Vane when going to Zenith |
TF |
1 |
|
|
Check in and document all software checked out for editing
|
TF BP |
1 |
|
|
Replace temporary network cable used for CTSB and put in
spare cables. |
DF |
1 |
|
|
Replace connectors with broken tabs on existing cables |
DF |
1 |
|
|
Find a permanent home for smtotux |
TF |
2 |
|
|
Continuously measure building currents to be saved after fuse blows. |
TF |
2 |
|
|
Move temperature sensors
in Computer Room closer to hot computer racks. |
SB |
2 |
|
|
Go through computer room
racks and get rid of old cables and lefts over pieces. |
TF All |
2 |
|
|
Create “engineering
mode” to run tests for engineers when the building is closed. |
BP |
2 |
|
|
Redo taumeter chart and
control program |
TF |
2 |
|
|
Explore the possibility of Frequency Switching Observations at the SMT |
Dr X |
2 |
|
|
Measure the signal from the inclinometer temperature sensor. |
TF |
2 |
|
|
Implement computer control over the IF switch box in the
computer room: |
TF |
2 |
|
|
Report which SAMBUS bit(s) are stopping AOS/FFB integrations |
BP |
2 |
|
|
Implement specifying different frequencies of subreflector
nutation in the DBE |
TF |
2 |
|
|
Check out why Emergency Stop on Carousel doesn't register
with the ISC |
TF |
2 |
|
|
Get source code and recipe for downloading ISC software |
TF |
2 |
|
| |
|
|
|
| |
|
|
|
Prime Focus
|
|
|
|
|
Check sun limits and for heating of translation stage. |
BP |
1 |
|
|
Pinhole camera tests |
BP |
1 |
|
|
Touch up paint work on Quadra pod |
PF |
2 |
|
| |
|
|
|
Receivers
|
|
|
|
|
Cold Head maintenance |
MM |
1 |
|
|
Check vacuum lines and valves |
BM |
1 |
|
|
Clean N2 cans |
BM |
1 |
|
|
Check calibration on light tower. Change battery |
BM |
1 |
|
|
Process and summarize all efficiency measurements made last
season |
KX BP |
1 |
|
|
Document frequencies of spurious ALMA Tsys spike and track
down the cause |
GR GL BP |
1 |
|
|
Continue investigation of repair of 19-channel bolometer. Ask
Hertz Group for help? |
RF |
1 |
|
|
Install remote Power Fail monitor capability in compressor |
MMc |
1 |
|
|
Compressor repairs and modifications |
MM |
2 |
|
|
Change oil in vacuum pump |
SB |
2 |
|
|
Create new tuning tables. |
BM |
2 |
|
|
Blow out and check connection on Tau meter |
BM |
2 |
|
|
Check GPS antenna and rain Detector. |
BM |
2 |
|
|
Compile JT RX Tuning Guide |
GR |
2 |
|
| |
|
|
|
Backends / IF
|
|
|
|
|
Encoder power supplies- Change to ext. 115 Volts.. |
TF |
1 |
|
|
Verify AOS center channels. |
BP |
1 |
|
|
Debug and modify interface cards to eliminate 512 channel dropouts. |
DF |
1 |
|
|
Massive IF upgrade to support (4) 1 GHZ IF from ALMA/ JT Receiver |
All |
1 |
|
|
Build noise injection device to check for non-linearity in IF
chain. |
DF RF BP |
1 |
|
|
Investigate what causes curved baselines in spectral line
observations of planets |
GL GR RF BP |
1 |
|
|
Check out AOS-B dark pixels |
BP |
2 |
|
|
Rewrite Backend module
for TO manual |
TJ |
2 |
|
|
PM on FFB ( clean filters, blow out dust, etc.) |
DF |
2 |
|
|
PM on AOS ( clean filters, blow out dust, etc.) |
|